THE PRODUCTION COMPLEX
«CHERNOBYL POWER STATION»
(Contract 1-U/96 dated March 11, 1996)
Denomination of services rendered: Upgrading of
Chernobyl Power Station information network.
Date of the system launching: the first stage –
February 1996.
Brief performance specifications of the System and the
List of tasks fulfilled:
- The main backbone line laying is completed – an optical
fiber communication cable line was laid along the route: «Kvant» edifice –
ABK1 – TSSHCHU (1st line) – SHCHSRK (2nd line); the data terminal optical
fiber equipment is assembled;
- There was completed the assembly of the distributive
subsystem and the 5th category workplace subsystems on the base of a
foil-clad twisted pair cable (FTP) in the «Kvant’s» building as well as in
the ABK1;
- The distributive subsystem and the 5th category
workplace subsystems on the base of foil-clad twisted pair cable (FTP)
were tested in the special operation conditions zone;
- A network-forming equipment in the «Kvant’s» building
and in the ABK1 was connected to the main backbone line (CISCO router and
switchboard, Hewlett-Packard concentrators) as well as to the 2 Mbit-PCM
highway at the «Kvant» automatic telephone system (ATS) (CISCO access
server, RAD speed modems); an equipment tuning and adjustment is carried
out;
- A network-forming equipment (CISCO router) in Slavutich
town has been connected to the ATS and the communication with the
Chernobyl Power station via a 2 Mbit-PCM highway was provided. 300 new
users were connected to the network with by providing a simultaneous
access of all the clients of the existing Arcnet network towards it;
- There was accomplished a link-up of remote local
networks on the territory of the Chernobyl Power station («Ukryttya» and «Ostriv»
objects) using communication lines allotted and the network-forming
equipment (CISCO routers, «Motorola» modems);
- Software tuning and adjustment for the network
functioning control is completed;
- At further stages it is planned to increase the number
of users connected up to 400 – 500 units.
The basic equipment and software used while developing
and installing the System
The hardware applied is manufactured by these companies:
CISCO, Hewlett-Packard, Victron, Alcatel, IBM, RAD, Motorola.
The software installed: Novell ManageWise, CiscoWorks, HP
Open View.
«The United Informational Calculations network of
Slavutich town and the Chernobyl Power station designed and implemented by
the INT is an indivisible organism consisting of hundreds of computing
machines, communications, plastic cards, a distributed database and
financial and accounting applications».
V. Goloskokova, Head of the ASUP Department, Chernobyl